X

爱尔兰美洲研究论文代写:安大略省

论文代写

爱尔兰美洲研究论文代写:安大略省

安大略的电力系统是非常复杂的,几个合同随着成本的隐藏。安大略核能成本的猜测也很高。如果采取措施改善安大略电力系统的老化,则必然会导致电力消费者的价格变化。由于投资正在全国各地,客户的价格不断上升(达到百分之40)。根据最近安大略绿色能源法案,它已经表明,适合的行为其中能量饲料价格的资费方案是支付给可再生能源生产商在电力电网造成了高威胁(斯托克斯490-500)。这些威胁带来的客户使他们需求的电力部门使用较少的昂贵的电力来源,提高价格(斯托克斯490-500)。2009制定了《绿色经济法》,旨在解决安大略经济增长和环境问题。
这是不可能的,安大略的发展环境和GEA法案将这些改进所发生的任何改进的是那些会发生在趋势科技与政策制定后1970年。因此,它是安静的可能性,通过增加额外的风力发电的电网将导致结束了从发电系统的空气排放量的全面增加。
如果电网发生进一步的电膨胀,则会导致基本负荷的能力,从而减少对核能发电的更高需求。因此,GEA政策下电力系统进一步扩展将导致向空气中排放,从而增强屏障对脱碳。

爱尔兰美洲研究论文代写:安大略省

The electricity system of Ontario is highly complicated and several contracts along with costs are hidden. The speculation of nuclear energy costs is also high in Ontario. If steps are taken to improve the aging electricity system infrastructure of Ontario then it leads towards inevitable price change for the consumers of electricity. Due to investments being made across the nation, the prices for the customers are consistently rising (reaching to 40 percent). According to the recent Ontario Green Energy Act, it has been depicted that that the tariff program of FIT in the act wherein a price for energy feeding is paid to the producers of renewable energy over the grids of electricity poses high threats (Stokes 490-500). These threats result in increasing the prices for the customers making them demand the electricity authorities to use a lesser expensive source of electricity (Stokes 490-500). This Green Economy Act, 2009, was formulated with the aim to address Ontario’s economic growth promotion and to address the issues of environment.
It is not likely that the GEA act of Ontario will develop any improvement in environment and those improvements which have taken place are those which would have happened under the trends in technology and policy formulated back in the year 1970. Therefore, it is quiet plausible that by adding additional power of wind to the electricity grids will lead towards ending up the complete increase in air emissions from the electricity generation system.
If further electricity expansion of the grid takes place then it leads towards capacity of base-load to reduce causing higher needs in nuclear generation. Therefore, further expansion of electricity system under the GEA policy will lead towards enhanced emissions in air and hence a barrier towards de-carbonization.