这里提出了一个初步的项目计划。该项目计划可能会改变基于时间的限制,或可能有改变的基础上初步调查结果。这将上报项目协调员和其他赞助商的研究。
作业:
文献综述:对同一主题的现有研究进行了详细的文献综述。文献综述要批判地分析,在1个研究结果)提高酒店业的熟练员工的保留,2)与招聘相关的费用,在酒店行业的培训和保留的做法,3)专业的问题,特别是在烹饪部门人力资源方面,4)为以上问题的解决方案。
数据收集:数据收集是一个重要的任务,这将是通过协调与业务有关的问题,其中的改进建议。
最后报告:这是任务的最后一部分,最后的报告是根据初步研究的结果准备的。
时间表:
与文献复习和收集的其他辅助数据的时间将是2-3周。收集的数据估计是各地3-4周,这也需要基于参与者的可用性调整。该项目的数据分析和最终报告将在数据收集后2-3周准备。
人力资源:
研究人员将只参与该项目。该项目估计将是一个大约3个月。
项目控制:
进度进行监控,通过严格遵守规定的时间。项目坚持时间和里程碑报告将传达给相关的利益相关者。在本报告的背景下,利益相关者包括正在分析的业务,作为一个案例研究和导师分配。
质量控制:
交付的质量,这是初步的报告草案报告,将保持与利益相关者不断沟通他们。这种方法的任何期望,从报告,或任何偏差,从最初的建议,可以检查和纠正的问题。

英国中央圣马丁艺术与设计学院代写:项目建议书

An initial project plan is presented here. This project plan might change based on the time constraints or might have to change based on initial findings. This will be reported to the project co-ordinators and other sponsors for the research.
Assignments:
Literature Review: A detailed literature review will be conducted on existing researches on the same topic. The literature review will critically analyze and present the findings on research with respect to 1) improving the retention of skilled employees in the hospitality sector, 2) costs associated with the recruitment, training and retention practices within the hospitality industry, 3) majors issues with respect to human resources in the cookery departments in particular, 4) solutions for the issues and more.
Data Collection: Data collection is an important assignment here, this will be done by coordinating with the business in question for which the improvement are going to be suggested.
Final Report: This is the concluding part of the assignments; the final report is prepared based on the findings from primary research.

Schedule:

Time associated with Literature Review and collection of other secondary data will be 2-3 weeks. The data collection estimated to be anywhere around 3-4 weeks, and this will also need to be adjusted based on the availability of the participants. The data analysis and final report of the project will be prepared by 2-3 weeks after the data collection.
Human Resources:
The researcher will only be involved in the project. The project estimate would be a around 3 months.
Project Control:
The progress be monitored by means of strict adherence to the allotted times. Project adherence to time and milestone reports will be communicated to the relevant stakeholders. In the context of this report the stakeholders include the business that is being analyzed as a case study and the instructor assigned.
Quality Control:
Quality of the deliverables, which are the preliminary draft reports, will be kept by communicating them constantly with the stakeholders. This way any expectations from the report, or any deviations from the initial proposal could be checked and the issues rectified.